刘慧琼,唐黎舟,肖潇,张佳宇.高压业扩工程接入系统方案优化设计研究[J].电力需求侧管理,2017,19(4):54-58 |
高压业扩工程接入系统方案优化设计研究 |
Research on optimization design of high voltage business expansion project access system scheme |
投稿时间:2017-03-13 修订日期:2017-04-28 |
DOI:10.3969/j.issn.1009-1831.2017.04.013 |
中文关键词: 供电方案 建设经费 建设工期 优化设计 |
英文关键词: power supply scheme construction funds construction period optimization design |
基金项目: |
|
摘要点击次数: 3376 |
全文下载次数: 2449 |
中文摘要: |
对传统的高压业扩工程接入系统方案设计中,在线路负荷条件允许的情况下,通常仅将供电电源点与受电点间的距离作为单一参考标准的局限性,提出了以建设经费与建设工期为约束条件的一种高压业扩工程供电方案优化设计方法.综合考虑日均收益值、线路长度、线路类型等因素的影响,确定最优供电方案。 |
英文摘要: |
In view of the traditional high voltage business expansion project access system scheme design, under the condition of the circuit load conditions allow, usually the method only putting the distance between power source and the electric point as the single reference standard is of limitation.The paper put forward the new method that is the construction funds and construction period as the constraint condition of a high voltage power supply business expansion project scheme optimization design method.The optimal power supply scheme is determined by considering the influence of daily profit value, line length and line type. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |