Day-ahead optimal operation of building integrated energy system considering source and load uncertainty
CSTR:
Author:
Affiliation:

(1. School of Electric Power Engineering, Nanjing Institute of Technology, Nanjing 211167, China;2. School of Electrical and Power Engineering, Hohai University, Nanjing 211100, China)

Clc Number:

TM73;TK01

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the challenges of stochastic fluctuation at both source-load terminals in the optimization operation process of integrated building energy system, considering the influence of source-load uncertainty factors, a day-ahead optimization method for integrated building energy system based on fuzzy chance-constrained programming is proposed. Firstly, based on the equipment model of the integrated building energy system, the day-ahead optimal operation model of the integrated building energy system is established. Secondly, considering the influence of the uncertainty of photovoltaic and electricity, cooling and heat loads in the building system, the uncertainty of source-load is represented in the form of fuzzy chance constraint based on fuzzy membership function, and the day-ahead optimization operation model of building integrated energy system based on fuzzy chance constraint programming is proposed, and the clear equivalence class method is used to transform and solve the model. Finally, the effectiveness of the proposed method are verified by an example analysis.

    Reference
    Related
    Cited by
Get Citation

翟晶晶,冷 昕,李承澳,傅质馨.考虑源荷不确定性的楼宇综合能源系统日前优化调度[J].电力需求侧管理英文版,2025,27(5):71-77.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 24,2025
  • Revised:July 03,2025
  • Adopted:
  • Online: November 03,2025
  • Published:
Article QR Code