Research on the planning method of distribution system with distributed generations considering the impact of short-term peak load
CSTR:
Author:
Affiliation:

(Chengdu Power Supply Company, State Grid Sichuan Electric Power Company, Chengdu 610000, China)

Clc Number:

TM727;TK018

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the problems of increased operating cost, insufficient line capacity and high operating risks caused by short-term peak loads after distributed photovoltaic is connected to the distribution network, a two-layer planning method of distribution network including distributed power is proposed considering the influence of short-time peak load. The upper-layer planning model is based on particle swarm optimization algorithm, and takes PV, energy storage cost, location and line expansion planning cost as the objective function to solve the problem. The lower-layer planning model uses self-organizing mapping method to select typical days of different load types and takes the minimum daily operating cost of distribution network as the objective function to solve the problem. Then, using the established two-stage planning method, taking the IEEE33-node distribution network system as an example, the influence of short-time peak load on the distribution network is analyzed. Finally, through scenario comparison, the necessity of considering the impact of short-term peak loads is further verified.

    Reference
    Related
    Cited by
Get Citation

郝文斌,谢 波,孟志高,曾 鹏,李欢欢,何凌云.考虑短时尖峰负荷影响的含分布式电源配电系统规划方法研究[J].电力需求侧管理英文版,2025,27(2):105-112.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 14,2024
  • Revised:January 03,2025
  • Adopted:
  • Online: March 30,2025
  • Published:
Article QR Code