(1. Baoshan Power Supply Bureau, Yunnan Power Grid Co., Ltd., Baoshan 678000, China;2. School of Electrical Engineering, Nanjing Institute of Technology, Nanjing 211167, China;3. Nanjing Nari-Relays Electric Co., Ltd.,Nanjing 211102, China;4. School of Electrical Engineering, Southeast University, Nanjing 210096, China)
TM731;TM615
YANG Zongming, ZHU Hongjie, CHEN Guanyu, MAO Jianwei, ZHENG Qingchun, YANG Ming. Real-time dispatch optimization strategy for active distribution network based on model predictive control and opportunity constraints[J].,2023,25(2):23-29.
Copy
