Power demand response capability calculation and reserve objective optimized decomposition of Henan province
CSTR:
Author:
Affiliation:

(1. Economic Research Institute, State Grid Henan Electric Power Co., Ltd., Zhengzhou 450000, China;2. Marketing Department, State Grid Henan Electric Power Co., Ltd., Zhengzhou 450000, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the 14th Five-Year Plan period, the gap between power supply and demand in Henan province will continue to increase. The government and State Grid put forward clear requirements for gradually forming a 3%~5% demand response capability, so as to guide the adjustable resources to favor regions with power supply shortage. In order to ensure the steady progress, the power supply and demand of the whole province are considered,and the decomposition optimization of the provincial mand response reserve target in each municipality are achieved based on the assessment of the demand response capability of 18 cities. Relevant methods and conclusions can be applied to the formulation of demand response plan, which is conducive to the integration of demand side adjustable resources, so as to better play the role of guaranteeing the balance of supply and demand and mitigating power grid investment.

    Reference
    Related
    Cited by
Get Citation

刘军会,刘湘莅,华隽,白宏坤,付涵.河南省电力需求响应能力测算与储备目标优化分解[J].电力需求侧管理英文版,2021,23(3):75-79.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 18,2020
  • Revised:January 08,2021
  • Adopted:
  • Online: May 24,2021
  • Published:
Article QR Code