Analysis of construction of the first batch of pilot areas in power spot market
CSTR:
Author:
Affiliation:

(1. Maintenance Branch, State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210000, China; 2. State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210000, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Power spot market is the core part of modern power market system, and it is the key step to improve market-oriented trading. All of the first eight pilot areas have been put into simulated trial operation, which marks a great step forward in the construction of power spot market in China. The similarities and differences in the construction scheme and related mechanism design of power spot market in the pilot areas are compared and analyzed from the three key aspects of construction framework, cohesion mechanism and operation mechanism. Some problems that the construction mechanism of electricity spot market is not compatible with the current electricity market system since the pilot area entered the simulation trial operation are analyzed, and relevant policy suggestions are put forward.

    Reference
    Related
    Cited by
Get Citation

朱 峰,刘力涵.电力现货市场首批试点地区建设情况分析[J].电力需求侧管理英文版,2021,23(2):74-78.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 15,2020
  • Revised:January 26,2021
  • Adopted:
  • Online: March 19,2021
  • Published:
Article QR Code