(1. Feidong Power Supply Company , State Grid Anhui Electric Power Co., Ltd., Hefei 231600, China;2. State Grid Anhui Electric Power Co., Ltd., Hefei 230022, China;3. Shanghai Branch, Nanjing SAC Power Grid Automation Co., Ltd., Shanghai 201319, China;4. Linyi Power Supply Company , State Grid Shandong Electric Power Company, Linyi 276003, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the power market, the investment and operation of load aggregator are facing uncertainty on both sides of electricity prices and consumers’demand response behavior. Based on the conditional value at risk, with profit maximization and risk minimization as the planning goals, a demand response resources’planning model for load aggregators is established. In the proposed model,historical simulation method is used to deal with the uncertainty from market electricity price, and random simulation method is used to describe uncertainty consumers’demand response behavior. Through simulating the optimal planning of investors under different risk appetite levels, the example analyzes the equilibrium relationship between the investment profit and investment risk of load aggregators, which provides a useful reference for the development of domestic load aggregators.

    Reference
    Related
    Cited by
Get Citation

张 鹏,蒯圣宇,刘 维,张如鹏,汪大为,杨 洋,王振宇.考虑双侧不确定性的负荷聚集商需求响应资源规划[J].电力需求侧管理英文版,2021,23(1):49-54.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 23,2020
  • Revised:October 17,2020
  • Adopted:
  • Online: February 01,2021
  • Published:
Article QR Code