Uncertainty correction method for planned load forecasting under the background of incremental distribution
CSTR:
Author:
Affiliation:

(1. State Grid Wuhan Dongxihu Electric Power Supply Company, Wuhan 430000, China;2. State Grid Wuhan Electric Power Supply Company, Wuhan 430000, China)

Clc Number:

Fund Project:

This work is supported by Science and Technology Project of State Grid Wuhan Electric Power Supply Company(No.Z915A018C041)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the incremental distribution network market at park level under the background of the new round of electricity reform, the problems and demands of load forecasting in power network planning are analyzed, and the description of load forecasting conclusions for incremental distribution network planning is improved, and a load forecasting model considering uncertainties such as distributed energy and occupancy rate is further proposed.Different confidence intervals is set according to the forecasting demand, and the load forecasting of incremental distribution parks under different development conditions is revised. Practical examples show that the method can provide a quantitative idea for precise planning of park incremental distribution network considering uncertainties.

    Reference
    Related
    Cited by
Get Citation

胡文博,王 宣,陈 艳.增量配电背景下考虑不确定性修正的规划负荷预测方法[J].电力需求侧管理英文版,2020,22(2):57-61.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 25,2019
  • Revised:December 06,2019
  • Adopted:
  • Online: March 30,2020
  • Published:
Article QR Code