System construction standard and application for power demand side management of industrial park
CSTR:
Author:
Affiliation:

(1. Industrial Power Demand Side Management Promotion Center of China Electricity Council, Beijing 100055,China; 2. Global Energy Interconnection Research Institute, Beijing 102209, China)

Clc Number:

TK018;F407.61

Fund Project:

This work is supported by Science and Technical Project of State Grid(No. SGGR0000XTJS1800957)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Focusing on the standard of“Construction of Power Demand Side Management System for Industrial Parks”, the necessity of setting standards for industrial parks and the current status of relevant standards are introduced. The standard is introduced and analyzed, the technical architecture, functions and applications of the power demand side management platform system in the standard is specified, and the direction of the next step of power demand side management standardization is proposed.

    Reference
    Related
    Cited by
Get Citation

YANG Di, GUO Pingping, HUANG Biyao. System construction standard and application for power demand side management of industrial park[J].,2019,21(2):74-76.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 31,2019
  • Revised:February 19,2019
  • Adopted:
  • Online: March 25,2019
  • Published:
Article QR Code