    Abstract:

    Due to the rapid development of electric vehicles,there is much potential for distributed charging piles to participate in power grid management. Typical evaluation indicators of load operation are compared, load fluctuation rate is selected as the objective of optimization, multiple target optimization model for load optimization with distributed charging piles is established, and the key characteristics of load fluctuation rate are extracted to establish the simple target function describing load fluctuation rate. The inflexibility of electricity pricing is solved by introduction of incentive points, and optimization target function of end user cost is built. Typical summer load conditions of certain distribution system feeder line located in Nanjing is taken for instance. MATLAB is used to simulate the load optimization featuring peak shifting and valley filling participated by 2 000 EVs and 500 EVs. It turns out that the fluctuation rate of grid load reduces obviously and the end users save cost greatly.

    Reference
    Related
    Cited by
Get Citation

杨斌,陈振宇,阮文骏,孙宇,陈嘉栋,宋杰.大规模分散式充电桩参与电网负荷优化技术研究[J].电力需求侧管理英文版,2018,20(6):26-30.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 22,2018
  • Revised:August 23,2018
  • Adopted:
  • Online: December 04,2018
  • Published:
Article QR Code