Case analysis on replacing coal boilers with electricity at Guiyuan hotel in Binzhou
CSTR:
Author:
Affiliation:

(1.State Grid Licheng Power Supply Company,jinan 250100, China;2.State Grid Shandong Comprenensive Energy Service Co.,Ltd.,Jinan 250012,China;3.State Grid Yantai Power Supply Company,Yantai 264001,China;4.State Grid Liaocheng Power Supply Company,Liaocheng 252001, China)

Clc Number:

F407.61;TK018

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Firstly, the basic situation of Guiyuan hotel project was described. Secondly, the design process of electric boiler system with phase change thermal storage was presented, such as heat load analysis and choice of equipment model. Finally, the process of construction and application effect was introduced. Implement of similar projects may benefit from the analysis.

    Reference
    Related
    Cited by
Get Citation

WANG Zhi liang, SHEN Rui bao, JU Wen jie, GAO Jian hong, ZHANG Ling bo. Case analysis on replacing coal boilers with electricity at Guiyuan hotel in Binzhou[J].,2018,20(5):45-47.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 15,2018
  • Revised:
  • Adopted:
  • Online: December 04,2018
  • Published:
Article QR Code