    Firstly, the basic situation of Guiyuan hotel project was described. Secondly, the design process of electric boiler system with phase change thermal storage was presented, such as heat load analysis and choice of equipment model. Finally, the process of construction and application effect was introduced. Implement of similar projects may benefit from the analysis.

    Reference
    Related
    Cited by
Get Citation

王志梁,神瑞宝,鞠文杰,高建宏,张令波.滨州贵苑大酒店燃煤锅炉电能替代案例分析[J].电力需求侧管理英文版,2018,20(5):45-47.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 15,2018
  • Revised:
  • Adopted:
  • Online: December 04,2018
  • Published:
Article QR Code