The discussion of the methods about selecting and inputting for testing interruptible loadmechanism in power grid interactive terminal facilities
CSTR:
Author:
Affiliation:

(1.State Grid Suzhou Power Supply Company, Suzhou 215004, China; 2.Jiangsu FangtianPower Technology Co., Ltd., Nanjing 210000, China)

Clc Number:

F407.61;TK018

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Large scale power.grid load friendly interactive sys.tem acts as a mode of protection to secure the running of global pow.er internet while the grid load interactive facilities installed in largeindustrial firms serves as the key action component.This paper intro.duces how to securely install and connect the grid load interactive fa.cilities at load terminals, accomplishing the interactions of produc.tion.load with the end.users and how to disconnect individual’s grid load instantly under power grid emergency situations.

    Reference
    Related
    Cited by
Get Citation

张峰,李新家.源网荷互动终端可中断负荷选择与接入调试方法探讨[J].电力需求侧管理英文版,2017,19(6):33-36.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 04,2017
  • Revised:
  • Adopted:
  • Online: December 07,2017
  • Published:
Article QR Code