Design and regulation of electric market in Texas America
CSTR:
Author:
Affiliation:

(Texas Electricity Market Independent Supervision Department, Texas 78705, USA)

Clc Number:

F416.61;TK018

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    From six aspects such as the real-time market construction, the secondary market, capacity market construction, market trends, market process, the energy market and transmission power market, America's electricity market reform experience is detailed analyed.In view of congestion management problems, the congestion revenue of the market is analyzed based on the analysis of the congestion charging of transmission lines and the absence of congestion charging.This paper introduces the main objectives of the regulation of electric power market in the United States.Finally, some experiences have been put forward in the process of power market reform.

    Reference
    Related
    Cited by
Get Citation

李永刚.美国德克萨斯州电力市场设计与监管[J].电力需求侧管理英文版,2017,19(4):62-64.

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 04,2017
  • Revised:
  • Adopted:
  • Online: October 12,2017
  • Published:
Article QR Code