计及新能源集群运行特性的多类型换流站配置方案评价方法
CSTR:
作者:
作者单位:

1. 国网新疆电力有限公司经济技术研究院,乌鲁木齐 830002 ;2. 国电南瑞南京控制系统有限公司,南京 211000

作者简介:

余金(1991),男,新疆阿克苏人,硕士,高级工程师,主要研究方向为电网规划。

通讯作者:

中图分类号:

TM73

基金项目:

新疆疆内交流电网与直流大母线耦合支撑运行分析(5230JY25000P)


Evaluation method for configuration schemes of multi-type converter stations considering operation characteristics of new energy clusters
Author:
Affiliation:

1. Economic and Technical Research Institute, State Grid Xinjiang Electric power Co., Ltd., Urumqi 830002 , China ;2. NARI Technology Nanjing Control System Co., Ltd., Nanjing 211000 , China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    高比例新能源集群并网后会导致直流系统送端电网出现短路容量不足、电压支撑薄弱等问题,单一换流站技术难以同时兼顾高比例新能源送端电网的经济性与稳定性要求。因此提出计及新能源集群运行特性的多类型换流站配置方案综合评价方法。首先分析新能源集群经多类型换流站外送传输系统的运行原理,阐明常规直流送端换流站与柔性直流送端换流站的协同互补机制,引入换流器交互量化指标(multi-infeed voltage interaction factor, MVIF)、关键节点过电压峰值、新能源场站短路比(renewable energy stations short circuit ratio, RSCR)3项核心指标,量化表征系统运行关键特征。其次,计及新能源集群运行特性与送端换流站间交互影响,建立覆盖成本效益、稳态安全、暂态抗扰三大维度的综合评价指标体系,采用熵权法与逼近理想解排序法(technique for order preference by similarity to ideal solution, TOPSIS)组合算法完成指标客观赋权与配置方案的综合排序。最后,结合西北某高比例新能源送端电网典型场景开展算例分析,验证了方法的有效性与工程实用性。

    Abstract:

    High-penetration new energy cluster grid integration leads to insufficient short-circuit capacity and inadequate voltage support in DC sending-end power grids, where single-converter-station schemes cannot satisfy economic and stability constraints simultaneously. A comprehensive evaluation method for multi-type converter station configuration schemes considering new energy cluster operational characteristics is proposed. The operational mechanism of multi-type converter station-based new energy outgoing transmission systems is analyzed, and the synergistic complementary characteristics of line-commutated converter (LCC) and voltage source converter (VSC) sending-end stations are clarified. Three quantitative indices, including the multi-infeed voltage interaction factor (MVIF), key node peak overvoltage, and renewable energy stations short circuit ratio (RSCR), are employed to characterize system operating performance. Considering the coupling interactions between new energy clusters and sending-end converter stations, a three-dimensional evaluation index system covering economic benefit, steady-state security, and transient disturbance resistance is constructed. The integrated entropy weight-TOPSIS algorithm is applied to achieve objective index weighting and optimal configuration scheme ranking. Case studies based on a practical high-penetration new energy sending-end power grid in Northwest China validate the effectiveness and engineering applicability of the proposed method.

    参考文献
    相似文献
    引证文献
引用本文

余金,黄慧,蒙昌营,李兆伟,陈诚,吴雪莲.计及新能源集群运行特性的多类型换流站配置方案评价方法[J].电力需求侧管理,2026,28(6):103-109