基于互补运行的风光储一体化基地规划研究
CSTR:
作者:
作者单位:

1.四川阿坝华电清洁能源有限公司,四川阿坝州 624400 ;2.水电水利规划设计总院,北京 100120 ;3.河海大学 新能源学院,江苏 常州 213000

作者简介:

曾鸣(1973),男,四川安岳人,正高级工程师,主要从事新能源大基地规划、工程开发与建设等工作。

通讯作者:

中图分类号:

TM73

基金项目:

国家自然科学基金项目(U2243243)


Study on planning of integrated wind-solar-storage energy bases with complementary operation
Author:
Affiliation:

1. Sichuan Aba Huadian Clean Energy Co., Ltd., Aba Prefecture 624400 , China ;2. China Renewable Energy Engineering Institute, Beijing 100120 , China ;3. School of New Energy, Hohai University, Changzhou 213000 , China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在“双碳”目标驱动下,建设风光储一体化基地是推动能源绿色低碳转型的关键路径。提出一种耦合风光资源时空特性与混合储能协同策略的规划方法,针对四川省西北部地区,将光伏、风电、储能的容量规模作为决策变量,构建以送电曲线匹配度为优化目标的互补模型,通过全年时序生产模拟筛选可行配置方案,并结合经济性评价模型进行比选,进行风光储互补基地的容量规划与电源配置决策研究。研究得出经济性最优的一体化基地规划方案,能够有效利用该区域风电高峰与光伏午间功率特性,通过储能分级调节,降低新能源外送通道弃电率。

    Abstract:

    Under the drive of the “dual-carbon” goals, constructing an integrated wind-solar-storage base is a critical pathway for promoting the green and low-carbon transformation of the energy sector. A planning methodology that couples the spatio-temporal characteristics of wind and solar resources with a coordinated hybrid energy storage strategy is proposed. The capacity scales of photovoltaic, wind power, and energy storage are treated as decision variables. A complementary model is constructed with the optimization objective of matching the power delivery curve. Feasible configuration schemes are screened through annual chronological production simulation and subsequently compared and selected using an economic evaluation model. A study on capacity planning and generation configuration decision-making is conducted. The study derives an economically optimal planning scheme for the integrated base, which can effectively utilize the region’s wind power peak periods and midday photovoltaic output characteristics. Through hierarchical dispatch of energy storage, the scheme reduces the curtailment rate of renewable energy in the outbound transmission channels.

    参考文献
    相似文献
    引证文献
引用本文

曾鸣,冯晓瑜,侯韬文,贾浩帅,许波峰,赵悦.基于互补运行的风光储一体化基地规划研究[J].电力需求侧管理,2026,28(2):22-28

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-11-22
  • 最后修改日期:2026-01-18
  • 录用日期:
  • 在线发布日期: 2026-07-20
  • 出版日期:
文章二维码