基于融合技术的中长期电力负荷预测方法
CSTR:
作者:
作者单位:

(1. 南京南瑞继保电气有限公司,南京 210000;2. 国网内蒙古东部电力有限公司 电力科学研究院,呼和浩特 010000)

作者简介:

徐浩(1981),男,江苏海门人,硕士,高级工程师,主要从事电力系统规划与管理工作;刘青红(1986),男,河南商城人,硕士,工程师,主要从事智能电网规划工作;仁正(1988),男,内蒙古巴彦淖尔人,硕士,工程师,主要从事电力系统运行分析工作。

通讯作者:

中图分类号:

TM715

基金项目:

内蒙古自治区科技重大专项(2021ZD0039)


Mid-long term electricity load forecasting method based on fusion techniques
Author:
Affiliation:

(1. Nanjing Nari-Relays Electric Co., Ltd., Nanjing 210000, China;2. Power Science Research Institute, StateGrid Inner Mongolia Eastern Electric Power Co., Ltd., Hohhot 010000, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    当前电力负荷预测模型在数据复杂性高、数据稀缺、模型泛化和动态社会经济因素适应性方面存在局限,影响了其在复杂电网规划中的应用。为满足电网或者大型风、光、火、储、网、荷能源基地项目的规划调度需求,提出了一种融合技术,将灰色预测、空间负荷密度预测和变分自编码器与深度因果卷积神经网络相结合,以实现中长期负荷预测。通过引入有序加权平均微分算子,融合不同预测方法,提升结果的准确性。实验结果表明,本方法相较于传统方法展现更高的准确性和鲁棒性,特别是在进行电力负荷远景预测时,所提方法能够有效提升预测的可靠性和适用性。该技术有效克服传统方法固有的数据复杂性、数据稀缺性和模型泛化问题,同时适应社会经济条件的动态变化。该方法为电网、大型源网荷储多能互补类项目的规划和发展提供有力的决策支持。

    Abstract:

    Current electrical load forecasting models are constrained by high data complexity, data scarcity, limited generalization, and in?sufficient adaptability to dynamic socio-economic factors, impeding their utility in sophisticated grid planning. To meet the planning andscheduling requirements of power grids or large-scale wind, solar, thermal, storage, grid, and load energy base projects, an integrated tech?nology has been proposed. Grey forecasting, spatial load density forecasting, variational autoencoders, and deep causal convolutional neu?ral networks are combined for medium to long-term load forecasting. The introduction of an ordered weighted averaging differential opera?tor amalgamates various predictive techniques, thereby refining accuracy. The experimental results demonstrate that the proposed methodexhibits higher accuracy and robustness compared to traditional methods, particularly in the context of long-term electric load forecasting,effectively enhancing the reliability and applicability of the predictions. This technology effectively overcomes issues of data complexity,data scarcity and model generalization inherent in conventional methods, while adjusting to socio-economic dynamics. It provides substan?tial decision-making support for the planning and evolution of power networks and large-scale integrated energy projects.

    参考文献
    相似文献
    引证文献
引用本文

徐 浩,刘青红,任 正,张 爽.基于融合技术的中长期电力负荷预测方法[J].电力需求侧管理,2024,26(4):94-99

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-04-06
  • 最后修改日期:2024-06-30
  • 录用日期:
  • 在线发布日期: 2024-07-18
  • 出版日期:
文章二维码