基于Sobol法的锂电池工业园区㶲分析及热经济分析研究
CSTR:
作者:
作者单位:

(1. 国网(苏州)城市能源研究院有限责任公司,江苏 苏州 215000;2. 东南大学 能源与环境学院,南京 210096;3. 国网天津市电力公司,天津 3000102)

作者简介:

赵杨阳(1990),男,通信作者,江苏镇江人,博士,高级工程师,研究方向为分布式能源系统优化运行控制。

通讯作者:

中图分类号:

TM912;TU83

基金项目:

国家电网有限公司总部科技项目(1400-202312333A-1-1-ZN)


Exergic and thermal economic analysis of lithium battery industrial park based on Sobol method
Author:
Affiliation:

(1. State Grid(Suzhou)City and Energy Research Institute Co., Ltd., Suzhou 215000, China;2. School of Energyand Environment, Southeast University, Nanjing 210096, China;3. State Grid Tianjin Electric Power Company,Tianjin, 300100, China.)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    锂电池工业园区可以充分利用资源优势,实现锂电池生产的规模化,然而规模化生产能量消耗强度大,带来了能源与环境问题,所以需要优化生产过程,以实现低碳化发展。目前对于锂电池制造过程的工艺优化研究较多,对园区层面系统性能的分析与优化的研究较少。旨在研究锂电池工业园区的能量生产和消费特征,并提出系统的优化改进方案。首先,建立了锂电池工业园区内典型设备和环节的稳态模型。然后,引入热经济学理论进行分析研究,构建了系统的?分析和热经济学分析模型,并提出了基于Sobol法的工业园区?分析和热经济分析方法。最后,通过算例分析验证了所提出方法的可行性和有效性。算例结果表明,热风炉在园区中的?效率最低,总成本最高,对于系统产品?成本的影响最大,需要重点改进其性能。

    Abstract:

    Lithium battery industrial park can make full use of the advantages of resources to achieve scale production of lithium battery,but the energy consumption intensity is large, and brings energy and link problems, so it is necessary to optimize the production processand achieve low-carbon development. At present, there are many researches on the process optimization of lithium battery manufacturingprocess, but there are less researches on the analysis and optimization of system performance at the campus level. The purpose is to studythe characteristics of energy production and consumption in lithium battery industrial park, and put forward the optimization and improve?ment scheme of the system. Firstly, the steady-state model of typical equipment and links in the lithium battery industrial park is estab?lished. Then, the exergic analysis and thermal economic analysis model of exergic analysis and thermal economic analysis of industrialpark based on Sobol method are built. Finally, the feasibility and effectiveness of the proposed method are verified by an example analysis.The calculation results show that hot blast furnace has the lowest exergic efficiency and the highest total exergic cost in the park, and hasthe highest impact on the exergic cost of system products, so it is necessary to focus on improving its performance.

    参考文献
    相似文献
    引证文献
引用本文

赵杨阳,翟德曼,张 利,艾邓鑫,周 咏.基于Sobol法的锂电池工业园区㶲分析及热经济分析研究[J].电力需求侧管理,2024,26(4):81-87

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-03-20
  • 最后修改日期:2024-05-15
  • 录用日期:
  • 在线发布日期: 2024-07-18
  • 出版日期:
文章二维码