考虑源荷不确定性的配电网风光储综合规划
CSTR:
作者:
作者单位:

(1. 国网湖北省电力有限公司 十堰供电公司,湖北 十堰 442000;2. 国网湖北省电力有限公司 竹山县供电公司,湖北 十堰 442200;3. 国网湖北省电力有限公司 郧县供电公司,湖北 十堰 442500)

作者简介:

王丹(1980),女,湖北十堰人,学士,高级经济师,研究方向为综合计划、电网投资;杨俊涛(1988),男,河南平顶山人,学士,高级工程师,研究方向为项目技术经济分析;曾燕(1988),女,湖北十堰人,硕士,工程师,研究方向为含高比例可再生能源的配电网规划。

通讯作者:

中图分类号:

TM711;TM73

基金项目:

国网湖北省电力有限公司科技项目(5215C0220001)


Comprehensive planning of wind-PV-storage in distribution network considering uncertainty of source and load
Author:
Affiliation:

(1. Shiyan Power Supply Company, State Grid Hubei Electric Power Co., Ltd., Shiyan 442000, China;2. Zhushan County Power Supply Company, State Grid Hubei Electric Power Co., Ltd., Shiyan 442200, China;3. Yunxian Power Supply Company, State Grid Hubei Electric Power Co., Ltd., Shiyan 442500, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对考虑分布式电源和负荷不确定性的配电网风光储综合规划问题,首先以概率模型表征分布式电源和负荷不确定性,并基于改进半不变量法求解概率潮流;然后考虑投资成本、碳成本、经济收益和电压改善等,以综合效益最大为目标,建立考虑无功补偿装置的风光储综合规划模型,并提出基于食肉植物算法(carnivorous plant algorithm,CPA)和协同进化算法(coevolutionary algorithm,CA)进行求解。该算法将待求解的多主体综合规划问题分解为分布式电源、储能和无功补偿装置3个子规划问题,并基于CPA对每个子问题进行求解,然后通过生态系统协调各种群进化,获取最优规划方案;最后在IEEE33节点和IEEE69节点算例中验证了模型的合理性和求解算法的高效性、普适性。

    Abstract:

    Aiming at the integrated WG- PV- ESS planning problem of distribution network considering the uncertainty of distributed power and load. Firstly, the uncertainty of distributed power and load is characterized by a probabilistic model, and the probabilistic power flow was solved based on the improved semi-invariant method. Then, considering the investment cost, carbon cost, economic benefits and voltage improvement, and aiming at maximize the comprehensive benefit, the comprehensive planning model of WG- PV- ESS comprehensive planning model considering reactive power compensation device is established. A carnivorous plant algorithm based coevolutionary algorithm is proposed to solve the model. In this algorithm, the multi-agent comprehensive planning problem to be solved is decomposed into three sub-planning problems:distributed generation, energy storage and reactive power compensation devices, and each sub-problem is solved based on CPA, and the optimal planning scheme is obtained by coordinating the evolution of various groups through the ecosystem. Finally, the rationality of the proposed model and the efficiency and universality of the solution algorithm are verified by IEEE33 and IEEE69.

    参考文献
    相似文献
    引证文献
引用本文

王 丹,杨俊涛,曾 燕,卢俊洋,洪 鑫,李妍擘.考虑源荷不确定性的配电网风光储综合规划[J].电力需求侧管理,2023,25(5):65-72