考虑光伏的备用容量替代配置优化模型
CSTR:
作者:
作者单位:

(1. 广东电网有限责任公司 电网规划研究中心,广州 510000;2. 广东工业大学 自动化学院,广州 510006)

作者简介:

李猛(1991),男,安徽阜阳人,硕士,研究方向为电力系统规划;吴伟杰(1979),男,广东新会人,硕士,高级工程师,研究方向为电力系统规划;吴杰康(1965),男,通信作者,广西南宁人,博士,教授,博士生导师,研究方向为电力系统规划、运行与控制;李红玲(1997),女,江西抚州人,硕士研究生,研究方向为电力系统规划与运行;郑敏嘉(1992),女,广东揭阳人,硕士,工程师,研究方向为电源规划;张伊宁(1991),女,浙江兰溪人,博士,工程师,研究方向为电力系统规划;黄欣(1987),女,湖北十堰人,硕士,高级工程师,研究方向为电力系统规划;孙辉(1994),男,湖北随州人,硕士,研究方向为电力系统规划。

通讯作者:

中图分类号:

TM615;TK02

基金项目:

广东电网有限责任公司科技项目(031000QQ00210010)


Alternative allocation optimization model of reserve capacity considering photovoltaic
Author:
Affiliation:

(1. Grid Planning and Research Center, Guangdong Electric Power Co., Ltd., Guangzhou 510000, China;2. School of Automation, Guangdong University of Technology, Guangzhou 510006, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在新能源环境下,负荷需求与新能源发电的不确定性对备用容量对提出了更高的要求,新能源与备用替代日益受 到 关 注 。 根 据 电 量 不 足 期 望 值(expected energy not supplied,EENS)与备用容量的关系,确定了电力系统备用总量,并采用优先分配方式在多类型的发电机组中分配备用容量。基于EENS与运行成本,构建光伏发电系统替代火电机组的综合替代效益评价指标,以综合替代效益评价指标的数值最小化为目标函数,构建考虑光伏发电系统替代火电机组参与备用运行的电力系统备用容量优化模型。并用分段线性理论对具有二次特性的目标函数进行线性化处理,采用分支定界算法求解构建的非线性整数规划问题。以IEEE-30系统作为实例,计算结果表明,光伏发电系统替代火电机组参与备用运行,可以降低综合替代效益及备用容量。

    Abstract:

    In the new energy environment, the uncertainty of load demand and new energy power generation puts forward higher requirements for reserve capacity, and new energy and reserve replacement receive increasing attention. Based on the relationship between expected energy not supplied(EENS)and reserve capacity, total reserve capacity of the power system is determined and capacity is allocated among various types of generating units in a preferential way. Based on EENS and operation cost, the evaluation index of comprehensive substitution benefit of photovoltaic power generation system replacing thermal power units is constructed. The value of comprehensive substitution benefit evaluation index is minimized as the objective function, and the optimization model of backup capacity of power system considering the photovoltaic power generation system replacing thermal power units in backup operation was constructed. The piecewise linear theory is used to linearize the objective function with quadratic characteristics, and the branch-and-bound algorithm is used to solve the nonlinear integer programming problem. Taking the IEEE- 30 system as an example, the calculation results show that the photovoltaic power generation system replaces the thermal power unit in the standby operation, which can reduce the comprehensive substitution benefit and reserve capacity.

    参考文献
    相似文献
    引证文献
引用本文

李 猛,吴伟杰,吴杰康,李红玲,张伊宁,李逸欣,郑敏嘉,孙 辉.考虑光伏的备用容量替代配置优化模型[J].电力需求侧管理,2023,25(2):15-22

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-12-05
  • 最后修改日期:2023-02-11
  • 录用日期:
  • 在线发布日期: 2023-03-22
  • 出版日期:
文章二维码