The idea combining the technicality of TVPP witheconomic of CVPP is proposed, namely TVPP pursues the maximization of its own economy in the condition of providing voltage control service to power grid. The TVPP economic scheduling optimization model based on IEEE-33 nodes distribution network is firstly established, and the model’s objective function is the TVPPmaximum economic profits and minimum voltage deviation in therestrict conditions of distributed power itselves’restraints and power balance restraints as well as the network node -voltage constraints. The above optimization model is simulated and solvedwith the modified genetic algorithm. The optimal economic operation strategy of the technology virtual power plants in considerationof providing node voltage control service to the distribution network can be got from the simulation results, which verifies the feasibility of the optimal scheduling strategy.